| Description | Written from Mill Wall Iron Works, London. The letter confirms that everything that can possibly be done before Watt & Co begin the installation of their auxiliary engines has been done and doing anything further will mean it will have to be ripped out in order to allow Watt & Co to install their engines. The letter also confirms that the beams or entablatures are ready for Watt & Co to fit them and also comments on the progress with the stoke and the floors. |